The city of Vilsbiburg is in the process of opening the Vilstalhalle (multi-purpose hall with 3 compartments, stage and grandstand)
to renovate and expand.
The construction period is scheduled from July 2023 to December 2025.
The work covers all trades of building construction.
Excavation for excavation, foundations, ground pipes etc.:1300m3
Partial demolition and disposal masonry 24 - 36,5cm: 420m2
Partial demolition and disposal Reinforced concrete floor slabs: 170m2
Partial demolition and disposal of reinforced concrete ceilings, walls :270m2
Betonschneidearbeiten 20-30cm Bauteildicke: 510m
Making a ceiling breakthrough in existing StB ceiling, 100 to >1501cm2: 215pcs
Making openings Masonry, interior and exterior walls 41pcs
Masonry work: new exterior walls, closing openings 50m3
Strip, single foundation walls, foundation slabs new, reinforced concrete 90m3
Base plate new/ addition, reinforced concrete: 225m2
Foundation wall reinforced concrete: 175m2
New ceiling/ addition, reinforced concrete: 110m2
New walls/ addition, reinforced concrete, D up to 35cm: 290m2
New interior walls, masonry 24cm: 42m2
Kelleraußenwanddämmung: 450m2
Insulating brick shell with core insulation: 270m2
Interior insulation walls: 475m2
Exterior plaster, also small areas: 400m2
Interior plaster, also small areas: 1240m2