Strasbourg-Entzheim Airport is launching this procedure in order to select a company or a group of companies for sub-project 2 of renovation of the airport's aeronautical pavements.
The work is for the rehabilitation of the taxiway PAPA, the primers of the taxiways echo, fox, golf, hotel, novembre, quebec, kilo and Mike
The purpose of the contract is to entrust its holder with the following missions:
- preparatory work/planing,
- aeronautical pavements,
- modelling/earthworks of grass strips and grassing,
- Civil engineering of lighting :
- intervention on existing premises,
- creation of new civil engineering,
- rainwater collection and management,
-Networks
- lighting (supply and installation),
- aeronautical marking
The estimated quantities to be implemented at this stage of the study are as follows.
- bituminous asphalt: 17 000 t
- planing: 7,000 m3
- coated/gutter joints: 3,000 ml
- Strip grading: 2,100 square metres
- Gutter recovery and gutter gaskets: 80 ml and 2400ml of seals
- trench recessed lights: 3600 ml
- 15 new markup manholes,
- 380 recessed beacon lights to be removed / Provide / rest
- 120 new recessed beacon lights to be supplied and installed
- 25 above-ground fires to deposit / provide / Rest
- 10 Panels to deposit / provide / rest (6 massive to recreate)
- 4 stop bars: 2 orderable and 2 permanent to be replaced and updated in collaboration with the corresponding control command marking,
- 3100 square meters of floor markings