Performances of the technical equipment "HLS" according to §§ 53 ff. HOAI 2013, Lph. 1-9, equipment groups 1, 2, 3 and 8, gradual retrieval, first performance phases 1 and 2.
General refurbishment or replacement school in the Weschnitzauen, Biblis
Performances of the technical equipment "HLS" according to §§ 53 ff. HOAI 2013, Lph. 1-9, equipment groups 1, 2, 3 and 8, gradual retrieval, first performance phases 1 and 2.
The school in the Weschnitzauen is a primary school with about 210 pupils in Biblis. The school is currently spread over 2 locations, but will be merged in the future on the common site Freiherr-vom-Stein-Str.1. Overall, there is a school complex and a former caretaker's house on the property. These buildings were built in the period around 1964.
Whether the existing building will be extended, or a replacement will be built, is not yet clarified. In order to expand the existing education and childcare provision, it is necessary to install a canteen with a dispensing kitchen for the "Cook and Chill" supply system.
Until the end of the refurbishment work has to be done on containers next to the location "Viktoriastraße 8, Biblis".
In a rough cost calculation, a total investment requirement of approximately EUR 8.1 million was determined.
KG 300: approx. 4.16 EUR million gross
KG 400: approx. 2.41 EUR gross
BGF: approx. 3 710 sqm.