Lot 12: Screed work
Part of the building extension
Floor areas:
- Cleaning the ground: 2.398,00 m2
- System edge strips made of PE foam: 1,231.00 m
- Impact sound insulation EPS 040, DESsg 25 - 2 mm: 80.50 m2
- Impact sound insulation EPS 040, DESsg 50 - 2 mm: 46.00 m2
- Dampfsperre PE Foil: 315.00 m2
- Nutzestrich CT-C35-F5-S85: 269,50 m2
- Nutzestrich CT-C35-F5-S60: 140,00 m2
- Nutzestrich/Heizestrich CT-C35-F5-S55-H55: 267,00 m2
- Nutzestrich/Heizestrich CT-C35-F5-S60-H60: 1.721,00 m2
- Cutting/closing false joints: 172.00 m
- Making movement joints: 62.00 m
- Making sloping screed: 166 m2
- Make recess for installation frame: 9.0 m2
- Working on penetrations & columns: 27 pcs
- Creation of measuring points: 60 pcs
- Stainless steel floor inlets, DN 100: 14 pcs
Part of the existing building
Floor areas:
- Cleaning the ground: 42.00 m2
- System edge strips made of PE foam: 49.00 m
- Impact sound insulation EPS 040, DESsg 50 - 2 mm: 42.00 m2
- Dampfsperre PE Foil: 315.00 m2
- Nutzestrich CT-C35-F5-S60: 76,00 m2
- Create movement joints: 10.00 m
- Making building separating joints in the screed: 3.00 m
- Create sloping surfaces/screed: 34.00 m2
- Closing recesses in the screed: 8.00 m2
- Cutting, making/closing false joints and movement joints: 20.00 m