Lot 19 - tile / concrete stone work.
The University and Hanseatic City of Greifswald plans to build the new Center for Life Science and Plasma Technology (Z4LP) within the city limits. For this purpose, an existing parking space is cleared and prepared for the upcoming new building.
This includes:
- Seal floor areas - 235 m
- Seal wall surfaces - 135 m
- Concrete stone floor 120 x 80 cm in a thick bed - 280 m
- Inside window sills cast stone L up to 2.50 m - 410 m.