The works to be realized include:
- north of the Marseille / Ventimiglia railway line, the extension of the Robert Brun avenue with requalification of the Girane alley to the east,
- the link between the extension of Robert Brun Avenue to the north and the south interchange pole, using the existing but unexploited underpass,
- south of the Marseille / Ventimiglia railway line, the exchange hub consisting of a ring connected to the east and west to the departmental road no. 63 (Yitzhak Rabin Avenue), to the south to the departmental road no. 18 (Estienne d'Orves Avenue) and north to the link with the extension of Robert Brun Avenue,
- 3 retention ponds for the expansion of the Vallat de Faveyrolles floods and a rainwater retention pond in the north-west of the sector,
- 2 parking lots The services are divided into 10 lots, these are unit price contracts.
Preparation, earthworks, Vrd
fences
Street lighting (excluding civil engineering)
Landscaping and watering
Stormwater lifting station
Civil engineering (casings and retaining structures)
Horizontal and vertical signage
Depollution and waste disposal
Level crossing equipment and signaling
Urban furniture