The Operation consists of 10 prizes. However, the present consultation consists of 9 lots (see 'Additional information'). These are framework agreements with purchase orders (reference Batiprix) with a maximum amount. Each lot will be the subject of a separate framework agreement. The estimated maximum amounts include all rollover periods. The Framework Agreement is concluded for an initial period of 12 months from the notification of the contract. Renewal: The number of renewal periods is set at 3. The duration of each renewal period is 12 months. The maximum duration of the contract, all periods combined, is 48 months
MasonryMasonry
Roads and highways, green spaces, outdoor landscapingRoads and highways, green spaces, outdoor landscaping
SealingSealing
Framework, roofingFramework, roofing
metalworkmetalwork
Plumbing heating ventilationPlumbing heating ventilation
Soft floorsSoft floors
painting- off-site Grenoblepainting- off-site Grenoble
plastering, joineryplastering, joinery