Sanitary installation work:
40 Küchenanschlüsse.
Approx. 3,500 m pipe network water, metal composite pipe and stainless steel pipe.
Insulation work on pipelines and fittings.
Ca. 360 Brandschutzabschottungen
in shafts, wall and ceiling penetrations.
Three new buildings with a total of approx. 142 rooms, 102 bathrooms with toilet, washbasin and shower tray facilities.