For the newly built half-timbered towers in project ZWO, DNV-GL is currently developing the Basic Design for TenneT into a Final Design. TenneT is supported by DNV-GL. The Final Design should then be developed into an Implementation Design/Workshop drawings. Based on this workshop
Lot 1- New VKA masts 380 kV solo for the new 380 kV connection Rilland-Tilburg (14 mast types),
— New masts in the existing 380kV connection Geertruidenberg-Eindhoven, three-circuit (eight mast types),
— Digitizing and elaborating aggravations for the existing number of masts in the existing 380 kV connection Geertruidenberg-Eindhoven, three-circuit (four mast types),
- Second opinion (s) on designs of other lots.
Lot 2- New VKA masts 380/150 kV combi for the new 380 kV connection Rilland-Tilburg (19 mast types),
- Second opinion (s) on designs of other lots.
Lot 3— New masts in the existing 380 kV connection Geertruidenberg-Rilland, two-circuit (six mast types),
— Digitizing and elaborating aggravations for the existing number of masts in the existing 380 kV connection Geertruidenberg-Rilland, two-circuit (two mast types),
- Existing 150 kV corner masts which are converted to take-off points (four mast types),
- Second opinion (s) on designs of other lots.