Lot 2 structural work / main construction work.
Type and scope of the service:
Lot 2: structural work / main construction work:
- approx. 1,400 m³ of excavation pit;
- approx. 680 m³ foundation pad RC 0/63;
- approx. 650 m³ excavation pipe and foundation trenches, backfilling;
- approx. 230 m³ backfilling construction pit;
- approx. 600 m underground pipes DN 100 to DN 200 in the excavation area;
- approx. 14 finished shafts NW 625 to 1,000 in the excavation area;
- approx. 34 m³ of reinforced concrete foundations;
- approx. 960 m² of reinforced concrete floor slabs, d to 70 cm;
- approx. 980 m² sealing of floor area V60 S4;
- approx. 4 200 m² external and internal walls reinforced concrete, semi-finished parts, d from 20 to 25 cm;
- approx. 50 running meters Columns, pillars of reinforced concrete;
- approx. 3 540 m² reinforced concrete ceiling and roof panels as semi-finished parts, s = 18 to 23 cm;
- approx. 110 running meters Joists combined with reinforced concrete ceiling;
- Inlay work elt., Equipotential bonding;
- approx. 240 tons of reinforcement;
- approx. 13 flights of stairs as precast reinforced concrete;
- approx. 260 m² masonry KS, d = 11.5 cm;
- approx. 17 m double-pass chimney made of lightweight concrete;
- approx. 2.4 t profile steel construction roof platform building services;
- approx. 2 240 m² facade scaffolding.