The district of Rottal-Inn is planning to build a new stand-alone hospice building near the hospital in Pfarrkirchen.
,
For this purpose, the planning services of the service profile technical planning technical equipment, plant groups 1, 2, 3 and proportionate 8 (HLS) in accordance with § 55 HOAI in conjunction with Anl. 15 No. 15.1, service phases 1 - 9 (phase 4 only in plant group 1) as well as the special service of monitoring the rectification of defects within the limitation period.
In Pfarrkirchen, near the local hospital, the district of Rottal-Inn is planning to build a new stand-alone hospice building. This inpatient hospice facility is to be designed for approx. 10 beds as well as corresponding wet rooms plus treatment and ancillary rooms. Recreation rooms for visitors and overnight accommodation must also be provided. A single-storey construction is to be carried out. The implementation of a timber frame construction is planned.
,
An aerial photograph / site plan is attached to the tender documents. Furthermore, the preliminary design planning by the architects has already been attached, as well as the first visualization drafts.
,
The construction site is near the Pfarrkirchen hospital next to the helipad in 84347 Pfarrkirchen between "Am Griesberg" and "Robert-Koch-Straße".
,
The estimated total costs are currently around 5 million gross for KG 200 to 700.
,
The funding application is to be submitted by the end of June 2024, and the approval planning is to be completed by the end of July 2024. Construction is scheduled to start at the end of 2024. Scheduled for early 2025. Completion of the project is expected to take place by mid-2026 at the latest.
,
A concrete operator is currently not yet conclusively available.
,
Plant groups 1, 2, 3 and 8 are required, whereby in plant group 8 only the proportion that is necessary for the control of the HVAC technology is to be taken into account.
,
A central oxygen supply may be required, but this depends on the operator who has yet to be found. At present, however, appropriate conduits are to be provided for a central oxygen supply that may be necessary at a later date.
,
Within the framework of this procedure, the planning services of the technical planning of technical equipment, plant groups 1, 2, 3 and proportionate 8 (HLS) in accordance with § 55 HOAI in conjunction with Anl. 15 No. 15.1, service phases 1 - 9 (phase 4 only in plant group 1) as well as the special service of monitoring the rectification of defects within the limitation period.
,
Phase 7 is rated one percentage point less, as the client provides services himself. This involves the dispatch or upload of the tender documents, the submission, the formal examination of the bids as well as the preparation and dispatch of the rejection letters. All reproduction costs will be invoiced directly by the client, this will be included accordingly in the contract.