Delivery of electricity (without grid use) to the following points of consumption of Forschungszentrum Jülich GmbH. A total electricity demand of 27 GWh is estimated.
The contractor shall supply the client with electricity as alternating or three-phase current as "green electricity" in accordance with the European standard DIN EN 50160 "Characteristics of voltage in public electricity supply networks" in the version valid on the day of publication of the invitation to tender
Delivery of natural gas to the following consumption points of Forschungszentrum Jülich GmbH. A total natural gas demand of 290 GWh is estimated.
Delivery of electrical energy (without grid use) to the eight consumption points of Forschungszentrum Jülich GmbH. An electricity demand of 27 GWh is estimated.
bnahmestelle UA North,
Abnahmestelle Cosy,
Collection point TEXTOR,
Collection point pumping station Schophoven,
Reception point guest house,
Abnahmestelle BAW,
Branch office Erlangen Cauerstr. 1 (with network use),
Branch office Erlangen Immerwahrstr. 2 (with network use).
The contractor shall supply the client with electricity as alternating or three-phase current as "green electricity" in accordance with the European standard DIN EN 50160 "Characteristics of voltage in public electricity supply networks" in the version valid on the day of publication of the invitation to tender.
Delivery of natural gas to the following four consumption points of Forschungszentrum Jülich GmbH. A total demand of 290 GWh is estimated.
Abnahmestelle Campus,
Abnahmestelle Wärmevollversorgungszentrale (WWVZ),
Collection point Gästehaus Jülich,
Acceptance point Erlangen, Immerwahrstr. 2