(Sub-task 1.5.16 under measure 1.6.2) entitled: Stage I "Construction of heating network 2DN200 and 2DN150 from point "Y" in Wolińskiego Street to point "U" and "W" in Domeyki Street. Budget No: I/00544/TCO/17" and (Sub-task 1.2.4 under measure 1.6.2) entitled: Stage II "Construction of pre-insulated heating network with connections to buildings B3 and B4 on the section from point 1.6.2). T3 to building B3 and B4 and from point. T3 to PK point near Zemborzycka / Granata street. Budget No: I/00543/TCO/17".
(Sub-task 1.5.16 under measure 1.6.2) entitled: Stage I "Construction of heating network 2DN200 and 2DN150 from point "Y" in Wolińskiego Street to point "U" and "W" in Domeyki Street. Budget No: I/00544/TCO/17" and (Sub-task 1.2.4 under measure 1.6.2) entitled: Stage II "Construction of pre-insulated heating network with connections to buildings B3 and B4 on the section from point 1.6.2). T3 to building B3 and B4 and from point. T3 to PK point near Zemborzycka / Granata street. Budget No: I/00543/TCO/17".
A detailed description of the object of the order is set out in Annex No 3 to SWZ.