The envisaged award includes the technical planning of technical equipment LPH 2-9 in accordance with Section 53 HOAI for plant groups 4 to 6. The assignment is made as a tier contract, the first stage concludes with service phase 4.
Special services are:
- Basic consideration of TGA in timber construction,
- Participation in the preparation of a report to assess sustainability,
- participation in the creation of a room book,
- Establishing a detailed property description as the basis of the service description,
- drawing up the service description with the service program,
- Examination of the execution planning drawn up by the construction company,
- preparation of the building documentation,
- preparation of the inventory documentation,
- Monitoring the rectification of defects within the limitation period.
An office building with a gross floor area of approx
The completion of performance level 1 is scheduled for the end of February 2021.