The subject of the order is the delivery of two pieces of arrays (mass storage) and four pieces of Fibre Channel switches along with the implementation and granting of a 60-month warranty for the delivered devices and the extension of the warranty period for Pure Storage disk arrays currently used by the Ordering Party. A detailed description of the subject of the contract is attached as Annex 1 to the SWZ.
The subject of the order is the delivery of two pieces of arrays (mass storage) and four pieces of Fibre Channel switches along with the implementation and granting of a 60-month warranty for the delivered devices and the extension of the warranty period for Pure Storage disk arrays currently used by the Ordering Party. The subject of the contract includes, among others: a) delivery and implementation of two arrays (mass storage) along with granting a 60-month warranty for the delivered devices – within 80 calendar days from the date of conclusion of the contract; b) delivery and implementation of four pieces of Fibre Channel switches together with a 60-month warranty for the delivered devices – within 80 calendar days from the date of conclusion of the contract; c) extension of the warranty period for the currently used four pieces of Pure Storage disk arrays until the end date of the warranty period granted for arrays (mass storage), delivered in accordance with point (a) in the framework of these proceedings – within 80 calendar days from the date of conclusion of the contract. A detailed description of the subject of the contract is attached as Annex 1 to the SWZ.