PART 1 - EXTENDED SHELL OF OFFICE AND SOCIAL BUILDINGS
The proposed measure is Part 1
- New office and social building Nordwasser-
The office/social building is planned as the future heart of the site.
It is designed as a corner building and forms the formative prelude when entering the central base.
For 125-150 employees, it provides the necessary changing rooms, showers, sanitary facilities, break/meeting rooms, master offices and laundry and drying rooms.
Object of performance Part 1 Extended shell of office and social buildings
The object of the service is the execution of a massively constructed three-storey building on an existing floor slab (Lot 1 – already implemented).
The building is L-shaped with central floor access, two wings and staircase connectors.
It has the dimensions of approx. 35 x 55 m with a built-up area of approx. 950 m² and a gross capacity of approx. 10570 m³.
The construction method is carried out as a mixed construction method with masonry / reinforced concrete walls and filigree ceilings and reinforced concrete flat roof. The flat roof is greened, the heat-exchanging exterior walls are insulated with ETICS, P/R facades and windows are aluminium constructions and receive external external venetian blind shading.
The following scope is the subject of the service:
- OWN CONSTRUCTION SITE EQUIPMENT
- scaffolding work
o approx. 2200 m2 façade scaffolding, metal scaffolding, LK 4
o 2 pcs scaffolding, mobile, LK 4, up to 3.10 m
o approx. 140 m3 scaffolding as ceiling scaffolding, inside, LK 4
- masonry
o approx. 370 m2 Masonry inner wall D 17,5cm KS-R P SFK20 RDK2 thin-bed mortar
o approx. 1000 m2 masonry inner wall D 24cm KS-R P SFK20 RDK2 thin bed mortar
- concrete and reinforced concrete work
o approx. 540 m2 in-situ concrete outer wall reinforced concrete C25/30 XC2 WU D 20cm
o approx. 975 m2 in-situ concrete outer wall reinforced concrete C25/30 XC1 D 20cm
o approx. 84 m in-situ concrete column reinforced concrete C25/30 XC1 SB3 rectangular
o ca. 2500 m2 Gitterträgerdecken C 25/30, d=6+19 cm
o ca. 160 m2 Ortbetondecken
o 8 St Fertigteiltreppenläufe
o 1 pcs precast roof plate vestibule
- waterproofing work
o approx. 915 m2 Waterproofing of base plate bitumen sheet
o approx. 350 m2 sealing of base surfaces with 2-component, flexible sealing slurries
ca. 270 m2 Perimeterdämmung
- roofing work
o approx. 915 m2 roof waterproofing as bituminous warm roof
o approx. 7.5 m2 Roof waterproofing liquid plastic Roof plate vestibule
o approx. 915 m2 green roof
o approx. 180 m fall protection flat roof railing
- interior plastering
a ca. 2300 m2 Gipsputz
a ca. 1100 m2 Kalkzementputz
- screed work
o approx. 870 m2 floating cement screed as heating screed
o approx. 1,330 m2 floating cement screed
- metalworks
o 90 pcs aluminium window elements
o 7 St. PR facades
o 6 pcs. 1-flg. Smoke protection door elements
o 3 St. Brandschutztürelemente T60
the Verblechungen
- sun protection systems
o 41 St. Venetian blind systems motor-operated
- INNENFENSTERBÄNKE
o 69 pcs. Interior window sills natural stone, individual lengths from 0.7 to 2.70 m
- thermal insulation composite system
o approx. 1,440 m2 EPS thermal insulation composite system with integrated boss panels and mineral wool insulation in fire wall areas
- ADVANCE SERVICES FOR THE EXPANSION OF HOUSE CONNECTION ROOMS
o Painting and floor coating in HA rooms in advance
PART 2 - EXTENDED SHELL WORKSHOP
The envisaged measure is Part 2
- New construction of workshop building Nordwasser-
Object of performance Part 2 Extended shell workshop building
The object of the service is the execution of a massively constructed single-storey building on an existing floor slab (Lot 1 – already implemented).
The building is rectangular and has the dimensions of approx. 12 x 50 m with a built-up area of approx. 600 m² and a gross capacity of approx. 3540 m³.
The construction method is a mixed construction with masonry / reinforced concrete walls and flat filigree ceiling.
The roof is greened, the heat-exchanging exterior walls are insulated with ETICS, the windows are aluminum constructions.
In the approach area there are 8 insulated sectional doors with pass doors.
The following scope is the subject of the service:
- OWN CONSTRUCTION SITE EQUIPMENT
- scaffolding work
o approx. 840 m2 façade scaffolding, metal scaffolding, LK 4
o 2 pcs scaffolding, mobile, LK 4, up to 3.10 m
- masonry
o approx. 570 m2 Masonry outer wall D 24cm KS-R P SFK20 RDK2 thin bed mortar
o approx. 500 m2 masonry inner wall D 24cm KS-R P SFK20 RDK2 thin bed mortar
- concrete and reinforced concrete work
o ca. 72 m Stahlbetonstürze
o ca. 575 m2 Gitterträgerdecken C 25/30, d=6+19 cm
o approx. 40 m2 in-situ concrete ceiling pl. Reinforced concrete C25/30 XC1 SB2 ceiling-D 25cm
o approx. 400 m2 floor slab C 35/45 Stb, d=16 cm on insulation
- waterproofing work
o approx. 570 m2 waterproofing of base plate bitumen sheet
o approx. 145 m2 sealing of base surfaces with 2-component, flexible sealing slurries
o ca. 70 m2 Perimeterdämmung
- roofing work
o approx. 590 m2 roof waterproofing as bituminous warm roof
o approx. 550 m2 green roof
- interior plastering
o ca. 1570 m2 Kalkzementputz
- screed work
o approx. 115 m2 floating cement screed
- metalworks
o 8 pcs sectional door with pass door W 3000 mm H 3000 mm drive electric motor
o 14 pcs aluminium window elements
o 3 pcs aluminium exterior doors
o 8 pcs. 1- flg. Steel interior doors of which 4 pcs with EI 30-S200C5 requirement
- INNENFENSTERBÄNKE
o 14 pcs. Interior window sills natural stone, individual lengths from 1.20 to 3.00 m
- thermal insulation composite system
o approx. 730 m2 EPS thermal insulation composite system
- ADVANCE SERVICES FOR THE EXPANSION OF HOUSE CONNECTION ROOMS