Ordinary works contractThe period of execution of the works is preceded by a preparation period of 2 months which is not included in the execution time
Cfa Cfo networks- Execution and detailed studies, - removal of existing equipment and cables (out of service or obsolete), - supply, handling, installation and connection of new high and low current boxes,- supply, installation and connection of new cables,- supply, installation and connection of systems (access control, video surveillance, fire detection and intrusion cameras)
VRD Foundations FencesNetwork worksroad rehabilitation worksFence workCivil engineering worksGreen space works