New building integrative school project Schweich consist of school building, swimming pool, three-field sports hall,
BRI 66,696 m³, GFA 13,574 m², VE 315 Locksmith work;
• approx. 95 m steel stair railing, with approx. 180 m wooden handrail;
• ca. 190 m Holzhandläufe
New building Integrative school project Schweich consist of school building, swimming pool, three-field sports hall,
BRI 66,696 m³, GFA 13,574 m², VE 315 Locksmith work;
• approx. 95 m steel stair railing, with approx. 180 m wooden handrail;
• ca. 190 m Holzhandläufe