The scope of the mandate concerns the CRFR-MUCO section, from km 18,100 to km 20,200 on line 255 of the FMA.
The objectives of the project are to:
- Completely renew railway facilities (infrastructure, superstructure, railway line)
contact, safety installations, engineering structure) between km18,100 and km19,941 (last TPF section of full slender track showing significant signs of fatigue).
- Adapt the superstructure between km 19.941 and km 20.200 to make a slight alignment correction (increase in the existing track cant of the track) in order to increase the operating speed by
50km/h to 60km/h.
The scope of the mandate concerns the CRFR-MUCO section, from km 18,100 to km 20,200 on line 255 of the FMA.
The objectives of the project are to:
- Completely renew railway facilities (infrastructure, superstructure, railway line)
contact, safety installations, engineering structure) between km18,100 and km19,941 (last TPF section of full slender track showing significant signs of fatigue).
- Adapt the superstructure between km 19.941 and km 20.200 to make a slight alignment correction (increase in the existing track cant of the track) in order to increase the operating speed by
50km/h to 60km/h.