4-storey extension to existing hospital as main measure
and conversion measures in the existing ground floor up to 3rd floor -
as well as preliminary measures with construction of external stairs and emergency exits
and interim relocation of the existing main entrance
9700 m² primer GK walls for mounting filler
2900 m² primer GK ceilings for mounting filler
4500 m² full-surface filler Q3
1390 m Filling, soffits and supports Q3
1000 m² plaster ceilings Q3
480 m filler GK ceiling friezes Q3 W= 10-70cm
200 m² full-surface filler suitable for damp rooms Q3
1400 m² protective cover of windows+external doors
9000 m² primer walls
8200 m² Wallpapering of walls with glass fabric 150 g, medium Structure
1850 m Wallpapering of soffits and supports with glass fabric 150 g
200 m² Wallpapering walls with glass fleece 50 g
50 m Wallpapering of soffits with glass fleece 50 g
9000 m² dispersion coating on walls, NAB-Kl. 1
1900 m dispersion coating on soffits and columns, NAB-Kl. 1
180 pcs. lettering on walls, H=up to 20cm
12200 m acrylic joints with/without backfilling
1200 m silicone joints
100 running metres of PUR joints
500 m² rework painting of walls NAB-Kl. 1
1900 m² Primer Ceilings
2200 m² Deckenanstrich m. Dispersion NAB-Kl. 1
970 lfm Deckenanstrich Friese m. Dispersion NAB-Kl. 1
200 m 2K painting heating pipes DN25-50mm
212 pcs. 2K painting steel frames W= up to 1.51m H= up to 2.26m
50 m² 2K painting of steel-sheet doors
50 running metres 2K painting stair railing H=1.00m