Consultative engineering and construction services | Tenderlake

Consultative engineering and construction services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
06 October 2023
Closing Date:
22 November 2023
Location(s):
NO081 Oslo (NO Norway/NORGE)
Description:
General plan for technical infrastructure, mobility, and a blue-green structure for Filipstad

Filipstad is a large harbour area along Fjordbyen in Oslo Municipality. The area borders Aker Brygge and Tjuvholmen in the east goes towards Frognerstranda in the west, and is currently cut in half by the E18. The current use of the area is dominated by a ferry terminal, container activities, and light harbour and logistics functions.

An infrastructure plan was prepared in 2013 as part of the preparation for area development of Filipstad, which was later updated in 2015. Due to changed prerequisites, the time that has passed since the last infrastructure plan was prepared, and changes to/decision points in the adopted area development, Oslo Municipality would now like to revise the infrastructure plan from 2015. A plan for blue-green structure and a mobility plan are also to be prepared as part of the review work. All of these three plans are to be coordinated, so that there is one general plan for infrastructure above and below ground. Climate gas calculations must also be worked out as part of the work.

Filipstad is a large harbour area along Fjordbyen in Oslo Municipality. The area borders Aker Brygge and Tjuvholmen in the east goes towards Frognerstranda in the west, and is currently cut in half by the E18. The current use of the area is dominated by a ferry terminal, container activities, and light harbour and logistics functions.

The area is regulated with the intention of facilitating an attractive business, recreation, and residential area.

The construction of public infrastructure within the planning area will be comprehensive, and will involve a number of complicated factors. The goal is to build the infrastructure in a rational and cost efficient way that complies with the guidelines for town development, climate, and the environment.

A infrastructure plan was prepared in 2013 for the preparation of the area development for Filipstad, which was later updated in 2015 (see annex 1).

Due to changed prerequisites, the time that has passed since the last infrastructure plan was prepared, and changes to/decision points in the adopted area development, Oslo Municipality would now like to revise the infrastructure plan from 2015. A plan for blue-green structure and a mobility plan are also to be prepared as part of the review work. All of these three plans are to be coordinated, so that there is one general plan for infrastructure above and below ground.

In addition to this, there are political guidelines that Filipstad must be a model area within the FutureBuilt programme. Climate gas calculations must therefore also be worked out as part of the work.

Download full details as .pdf
The Buyer:
Oslo kommune v/ Eiendoms- og byfornyelsesetaten
CPV Code(s):
71241000 - Feasibility study, advisory service, analysis
71243000 - Draft plans (systems and integration)
71310000 - Consultative engineering and construction services
71311200 - Transport systems consultancy services
71312000 - Structural engineering consultancy services
71313400 - Environmental impact assessment for construction
71314000 - Energy and related services
71320000 - Engineering design services
71400000 - Urban planning and landscape architectural services