Earthwork, excavation and concrete demolition work in the area of the outdoor pool, concrete pile foundation work including statics and measurement.
- 42 m
- 930 m
- manufacture 1 620 m bored piles, cased, d = 800 mm;
- 824 m
- 39.1 t pile reinforcement.