For the new construction of the indoor swimming pool in Pfaffenhofen an der Ilm, the trade "drywall and false ceilings" is being advertised. The expected execution / delivery time is from 2.11.2020 to 4.6.2021.
- Acoustic ceilings made of mineral fiber A1, d = 20 mm, installation height 7.18 m: 710 m
- Acoustic ceilings made of mineral fiber A1, d = 20 mm, installation height 2.70-3.20 m: 1 200 m
- Acoustic ceilings made of wooden strips in larch 20 x 40 mm: 185 m
- perforated ceiling plaster made of special plaster: 115 m
- lining skylights with special plasterboard: 9 pieces;
- Frieze formation made of special plaster, perforated and unperforated, width 40-100 cm: approx. 150 running meters;
- Underlay cladding made of special plaster: approx. 60 running meters;
- Dry plaster special plaster including reveal: approx. 100 m
- Ceiling sail special plaster with freely shaped, rounded edges, approx. 30 m
- Acoustic ceilings made of perforated plasterboard: approx. 210 m
- Facing shells and ceilings with cement-bound building boards: approx. 25 m
- Wall cladding made of larch rhombic formwork 70 x 34 mm on wooden substructure: approx. 270 m
- Facade cladding made of larch profile boards 34 x 134 mm on LM substructure and insulation 200 mm: approx. 160 m