Civil engineering and pipe laying work/horizontal flush bore
approx. 975 m² topsoil, approx. 1055 m³ trench excavation, approx. 700 m horizontal flush bore, approx. 120 m² road demolition and restoration, approx. 75 m DN 150 GGG iZ ZM, approx. 700 m DA 280x25.4, approx. 700 m multiple cable protection pipe 3x 50mm, approx. 20 m DN 100 PP KG2000, approx. 50 m DN 150 PP KG2000, 1 piece of venting shaft as precast part(s), incl. installation, 1 piece connection shaft S+A 5105, 5 pieces starting pits, 5 pieces target pits