The object planning building includes the renovation and the partial new construction of the property Marktplatz 9, Thurnau (former bakery Gräf) to the castle hotel as a component (BT) 1 (client Markt Thurnau). The renovation of the castle Thurnau, market square 1, Storchenbau, Kemenate, probably 2 to 3 floors - further floors after securing the financing and vaulting as a component (BT) 2 and the renovation / technical conversion of the buildings Oberer Schlosshof as a component (BT) 3 (Client Gräflich Giech'sche Spitalstiftung). The 3 components, as described above, are billed as 1 action.
The technical planning of technical equipment concerns: planning, tendering, local construction supervision and object support. Lot 1 Anl.gr. 1, 2, 3, lot 2 Anl.gr. 4, 5. The fee for the Lphen 1 to 9 amounts to approximately 247 000 EUR for the lot 1 with the equipment groups 1, 2 3, for the lot 2 with the equipment groups 4, 5 about 130 000 EUR, each net.
The specialist planning services in accordance with § 55 HOAI for the partial new construction of component 1, and renovation of the buildings of components 1 to 3 are to be commissioned. For all components, phases 1 to 9, with the conclusion of the contract, a partial or component-wise and stepwise commissioning is agreed. The respective construction phases are expected to be components 1 to 3. Further subdivision is reserved. The power level 1 includes the power phases 1 and 2 for all components. Power stage 2, power phases 3 and 4 as required, power stage 3 power phases 5 to 7 and power stage 4 power phases 8 and 9. Components to be processed are eliminated Installations are reinstalled. The special services, these are the participation in the procurement of funds and the monitoring of the elimination of defects as a special achievement of the performance phase 9. These are called up as needed. The preliminary work for the proof of the preventive fire protection is basic achievement of the achievement phases 3 and 4 (component of the building permit), a fundamental fire protection concept for the components 2 and 3 is present. The test expert fire protection is commissioned on site. In detail, the buildings or parts of buildings to be processed are to be taken from the site plan enclosed with the call for tenders or the description. In the case of the services, the partial demolition of the building is to be considered for the marketplace 9. The contract period does not include the services of the performance phase 9 and the special services of the Lph 9, which are commissioned beyond the basic services. The order value and the term are forecast values.
The specialist planning services in accordance with § 55 HOAI for the partial new construction of component 1, and renovation of the buildings of components 1 to 3 are to be commissioned. For all components, phases 1 to 9, with the conclusion of the contract, a partial or component-wise and stepwise commissioning is agreed. The respective construction phases are expected to be components 1 to 3. Further subdivision is reserved. The power level 1 includes the power phases 1 and 2 for all components. Power stage 2, power phases 3 and 4 as required, power stage 3 power phases 5 to 7 and power stage 4 power phases 8 and 9. Components to be processed are eliminated Installations are reinstalled. The special services, these are the participation in the procurement of funds and the monitoring of the elimination of defects as a special achievement of the performance phase 9. These are called up as needed. The preliminary work for the proof of the preventive fire protection is basic achievement of the achievement phases 3 and 4 (component of the building permit), a fundamental fire protection concept for the components 2 and 3 is present. The test expert fire protection is commissioned on site. In detail, the buildings or parts of buildings to be processed are to be taken from the site plan enclosed with the call for tenders or the description. In the case of the services, the partial demolition of the building is to be considered for the marketplace 9. The contract period does not include the services of the performance phase 9 and the special services of the Lph 9, which are commissioned beyond the basic services. The order value and the term are forecast values.