The contract consists of the extension of the underpass corridor in Froyennes station:
Side track A:
• Construction and installation of an extension for the existing corridor under tracks.
It is a precast concrete element based on micropiles;
• Construction and installation of a precast concrete retaining wall that will allow the local extension of the
way;
Side B:
• Construction and installation of a metal service track over the entrance to the corridor under tracks.
The contract consists of the extension of the corridor-underpass in Froyennes station:
Side track A:
• Construction and installation of an extension for the existing corridor under tracks.
It is a precast concrete element based on micropiles;
• Construction and installation of a precast concrete retaining wall that will allow the local extension of the track platform;
Side B:
• Construction and installation of a metal service track over the entrance to the corridor under tracks.