Renovation of Teckschule Wernau (3.BA) and renovation of kindergarten "Haus des Kind" - Sanitary
The construction site is located in the area of the area of the "Teckschule".
The school building is to be completely renovated in 3 construction phases, the subsequent kindergarten "House of the Child" is also to be renovated.
The present list of services includes the work in the 3rd construction phase of the school building (extension basement and ground floor) as well as in the kindergarten "House of the Child" (ground floor).
It is a solid building from the 1960s.
School building area
Outer walls:
Masonry, concrete
Cover:
via basement: ribbed ceiling and concrete ceiling
above ground floor: ribbed ceiling
Kindergarten area
Outer walls:
Masonry, concrete
Cover:
above ground floor: reinforced concrete ribbed ceiling and concrete ceiling
The building services are completely renewed.
The building envelope (windows, roof surfaces and facades) will be preserved. Floor plan changes and modernizations are made.
In the buildings adjacent to the construction site, school operations will continue.
Extent of the work:
Sanitary fittings 17 pcs
Pre-walls with mounting elements 14 pcs
Pipelines stainless steel DN 25-32 50 lfm
Pipelines Metal composite DN 10-DN 32 120 lfm
Rehabilitation of basic lines with inliner 10 lfm
Rehabilitation of downpipes with inliner 7 lfm
Drainage pipes plastic DN 100 490 lfm
Insulation work pipelines up to DN 100 270 lfm
WC exhaust air system 1 pcs
Dismantling equipment 35 pcs
Dismantling of pipelines up to DN 100 300 lfm