Arva will enter into new (parallel) framework agreements for consultancy services and technical subjects. A framework agreement will be entered into with a duration of 3 years, with the possibility for an extension of the agreement for a further 1 + 1 year.
The consultancy services include the following disciplines related to Arva's work on the construction and maintenance of the power grid in our service area:
- Analyses and investigations - grid systems (Dynamic analyses, Static analyses, Relay plans, Socio-economic analyses)
- Notifications/service applications/impact assessments - grid systems
- Engineering design of grid systems - 11-145 kV. (Overhead lines, underground cable systems, Submarine cable systems, Apparatus systems, Auxiliary and shared systems including control systems, Power transformers)
- Engineering design of buildings and roads connected to grid systems (Buildings, outdoors and roads
- Preparation of Environment, Transport and Construction plans (MTA plans)