Flood protection measures M1.14 at the Zwönitz in Burkhardtsdorf, VGE 1.14 C
New construction of HWS systems M1.14/1 — M1.14/8, M1.14/10 right and M1.14/24A — M1.14/26A.
— ca. 620 m of Fangedamm,
— approx. 1 350 m
— ca. 294 m
— supply and cover approx. 294 m
— approx. 1,459 m
— clearing water and coastal zone approx.
— approx. 3 236 m
— approx. 683 m
— milling approx. 1 035 m
— approx. 1 035 m
— approx. 1 035 m
— approx. 228 m of curbs natural stone,
— approx. 214 m of ledding stones natural stone,
— approx. 311 m
— approx. 40 m
— approx. 209 m paving strips of natural stone and small pavement in concrete bedding,
— produce approx. 734 m
— produce approximately 1 875 m
— approx. 319 t reinforcement steel,
— approx. 842 pieces of composite anchor,
— approx. 6 064 m of micropiles,
— approx. 1 428 m
— approx. 271 m steel railing,
— ca. 5 pcs. pits,
— grout approx. 1,072 m
— ca. 1 dam barrier,
— approx. 1 flood protection gate.