The implementation of the task “Construction of a new stop Oława Zachodnia carried out in the framework of the construction/ modernization of railway stops for the period 2021-2025” on line 132 section Brzeg — St. Catherine in km 157,100 will be carried out under the system “project and construction”.
The object of the order is the design and construction of two new one-edge platforms with a length of 200m - the Oława Zachodnia railway stop (working name) on line 132 with drainage, reach platforms, underpass under tracks of the appropriate standard tailored to local conditions and other necessary robots in the accompanying industries.
The object of the order is the design and construction of two new one-edge platforms with a length of 200m - Oława Zachodnia railway stop on line 132 with drainage, reach platforms, underpass under tracks with the appropriate standard adapted to the conditions local and other necessary robots in the accompanying industries.
The entire subject of the Order includes the implementation of the following elements:
1) design documentation necessary for the proper performance of all construction works and obtaining for it all the required opinions, arrangements, approvals, conditions, decisions and permits necessary to implement the subject of the contract;
2) all construction works in accordance with the scope of the contract on the basis of the design documentation prepared by the Contractor and approved by the Employer, referred to in the above-mentioned point 1, and all the preparatory works necessary to perform the scope of the contract and to perform all activities required by law;
3) Conformity assessment of the structural subsystem “Infrastructure” and “Control — trackside equipment” covered by the contract scope at each stage (design, construction and final subsystem trials).