Genilac Supply and installation BTHT

Supply and installation of low and high voltage general switchboards, with the commissioning of supervision.

-Lot 1: Supply of TGBT cells and CCBT supervision

-Lot 2: BT electrical installation

-Lot 3: Supply of TGHT cells with CCMT supervision and transformer supply + maintenance

-Lot 4: HV electrical installation

The contract covered by lot 1 concerns the supply and installation of 2 general low-voltage switchboards, with the commissioning of supervision.

The contract covered by lot 2 concerns the supply of electricity to the various hot cold production installations.

Supply and installation of 2 high voltage general switchboards, with the commissioning of supervision. As well as the supply of a 1000kVA transformer.

Follow-up of a preventive and curative maintenance contract.

Installation of a new line in parallel with the existing one, for the power supply of the HT18 substation from the HT19 substation, as well as the supply of the new HT44 substation.

Download full details as .pdf
The Buyer:
Aéroport International de Genève
CPV Code(s):
45310000 - Electrical installation work
45311100 - Electrical wiring work
45311200 - Electrical fitting work
45315400 - High voltage installation work
45315500 - Medium-voltage installation work
45317200 - Electrical installation work of transformers