Natural gas | Tenderlake

Natural gas

Contract Value:
EUR 2M - 2M
Notice Type:
Contract Notice
Published Date:
12 October 2022
Closing Date:
10 November 2022
Location(s):
DE214 Altötting (DE Germany/DEUTSCHLAND)
Description:
Supply of the MHKW with natural gas

Natural gas H to supply the Burgkirchen waste-to-energy plant with fluctuating purchase quantities. According to operating experience, the total consumption is 5,000,000 kWh/a. The maximum reference power up to 44,000 kW/h. On average, these maximum values are undercut.

Supply of the MHKW with natural gas H in relation to the maximum reference capacity specified in II. Point 1.4 as well as the expected annual total natural gas consumption from the transfer point to the MHKW factory premises!

Download full details as .pdf
The Buyer:
Zweckverband Abfallverwertung Südostbayern (ZAS)
CPV Code(s):
09123000 - Natural gas