The project manager can be entrusted with all or part of the following mission elements:
- preliminary studies (PRE);
- Pre-project studies (AVP);
- Project studies (Pro);
- assistance with the award of a specific works contract (ACT);
- visa for studies carried out by companies (VISA);
- Direction of the execution of the work contract (s) (DET);
- assistance during reception operations and during the perfect completion guarantee (AOR).
The works included in the contract are as follows:
- creation, rehabilitation, resizing or replacement of gravity or discharge networks including manholes and associated connections by trench technique;
- creation of networks by trenchless techniques;
- rehabilitation of existing networks by trenchless techniques including manholes and associated connections;
- creation / rehabilitation of prefabricated discharge stations as part of the extension and / or rehabilitation of networks.
Throughout the territory, the work projects included in this contract are as follows:
- creation, rehabilitation, resizing or replacement of gravity or discharge networks including manholes and associated connections by trench technique;
- creation of networks by trenchless techniques;
- rehabilitation of existing networks by trenchless techniques including manholes and associated connections;
- creation / rehabilitation of prefabricated discharge stations as part of the extension and / or rehabilitation of networks.
The contract does not include the following transactions:
- work on treatment plants;
- creation, rehabilitation, resizing or replacement of networks and / or structures linked to the treatment plant;
- creation of basins.