The project includes the renewal of the stops Arlesheimerstrasse, Perron 1 (FaRi Aesch Dorf) and Herrenweg (Perron 01 and 02) for the disabled. The project also includes the track geometry adjustment of Gleisaxe 01 in the area of the Herrenweg stop. The track geometry of Gleiaxe 01 will be adjusted vertically from railway km 7,557 to 7,778.
The work primarily includes the renewal of the platforms including railway platform angles / road adaptation and the construction of new service lines such as cable duct blocks including shafts. Various foundation work is planned.
The tram stop Arlesheimerstrasse is at least 630 m (as the crow flies) away from the Herrenweg stop.
The project includes the renewal of the stops Arlesheimerstrasse, Perron 1 (FaRi Aesch Dorf) and Herrenweg (Perron 01 and 02) for the disabled. The project also includes the track geometry adjustment of Gleisaxe 01 in the area of the Herrenweg stop. The track geometry of Gleiaxe 01 will be adjusted vertically from railway km 7,557 to 7,778.
The work primarily includes the renewal of the platforms including railway platform angles / road adaptation and the construction of new service lines such as cable duct blocks including shafts. Various foundation work is planned.
The tram stop Arlesheimerstrasse is at least 630 m (as the crow flies) away from the Herrenweg stop.