NGU will acquire an aeromagnetic survey in the Norwegian Sea. The survey consists of a total of 50 100 line-km with a line spacing of 5.5 km (NNE-SSW trending). Tie-lines should be flown at a distance of 25 km. The flying altitude is 120 m. The survey consists of approximately 350 hours flying, and NGU is inviting companies for bids on data acquisition and processing.
The technical proposal shall describe in details, the equipment and methodology to be used in performing the works. This description must be accompanied by unit prices, terms and conditions for all work, whether planned or unforeseen. The Bidder must assure that the experts and equipment will actually be available for NGU during the survey period.
The Bidder may present more than one technical proposal for performing the same work:
(1) procurement of crew and aircraft only; or
(3) procurement crew and aircraft equipped with instruments for aeromagnetic data acquisition WITH data processing services.
NGU will acquire an aeromagnetic survey in the Norwegian Sea. The survey consists of a total of 50 100 line-km with a line spacing of 5.5 km (NNE-SSW trending). Tie-lines should be flown at a distance of 25 km. The flying altitude is 120 m. The survey consists of approximately 350 hours flying, and NGU is inviting companies for bids on data acquisition and processing.
The technical proposal shall describe in details, the equipment and methodology to be used in performing the works. This description must be accompanied by unit prices, terms and conditions for all work, whether planned or unforeseen. The Bidder must assure that the experts and equipment will actually be available for NGU during the survey period.
The Bidder may present more than one technical proposal for performing the same work:
(1) procurement of crew and aircraft only; or
(3) procurement crew and aircraft equipped with instruments for aeromagnetic data acquisition WITH data processing services.