The purpose of this consultation is to carry out all the work involved in the creation of a pedestrian bridge between buildings A and B at the Kinga Centre in Kawéni
lot no1 : Frame - canvas - cladding - metalworkthe work in this lot includes:
- the realization of the metal frames bearing the textile covers of the project, including all the constraints related to the rework on the existing one (removal cladding, smooth removal, installation of reinforcements, lintels, chevêtres, cladding rest ...).
- The realization of the extension of the passageway in metal structure including treatment of the banks, constraints, undersides, etc ...
lot #2: Masonry - Aluminum carpentry - Tce finishrealization of masonry work, aluminum carpentry as well as finishing work all bodies of state, necessary for the construction of the footbridge