Cooling and ventilation equipment | Tenderlake

Cooling and ventilation equipment

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
25 January 2019
Closing Date:
08 March 2019
Location(s):
DE300 Berlin (DE Germany/DEUTSCHLAND)
Description:

Replacement chiller 3 and installation of a cold storage

Lot 1: technical building equipment (TGA)

Lot 2: demolition and shell work

technical building equipment

Rundfunk Berlin-Brandenburg (rbb) is planning measures to modernize its air conditioning and refrigeration systems at the Berlin Masurenallee location in the energy supply technology sector. The rbb operates an extensive cold water system for climate control requirements at the site. For reasons of efficiency, due to the age of the plants, it is planned to modernize the plant.

The chiller 3 is to be replaced by a modern, multi-stage controllable machine. Furthermore, a cold storage to be installed between the chillers and the cold water network for hydraulic separation. The supply pumps for the piping circuit between chillers and cold storage must be replaced. In the secondary piping circuit, 2 redundant 110d energy-optimized supply pumps are to be installed for the circuits in the FSZ skyscraper, FSZ low-floor building as well as HdR. The necessary measuring and control technology must also be renewed and connected to the central control room in the energy center. The conversion is only possible successively so that the site can be supplied with a sufficient amount of cold at all times. Therefore, first the new cold distribution and the cold storage

Being constructed. For this purpose, an adjacent technical room in the second basement of the FSZ Flachbau has to be constructed structurally as a new centralized distribution center. The technical operating rooms, which are located in the basement of the low-rise building, have partially contaminated cladding on steel girders and insulation on the technical equipment, which are to be removed.

Demolition and shell work

Rundfunk Berlin-Brandenburg (rbb) is planning measures to modernize its air conditioning and refrigeration systems at the Berlin Masurenallee location in the energy supply technology sector. The rbb operates an extensive cold water system for climate control requirements at the site. For reasons of efficiency, due to the age of the plants, it is planned to modernize the plant.

The chiller 3 is to be replaced by a modern, multi-stage controllable machine. Furthermore, a cold storage to be installed between the chillers and the cold water network for hydraulic separation. The supply pumps for the piping circuit between chillers and cold storage must be replaced. In the secondary piping circuit, 2 redundant 110d energy-optimized supply pumps are to be installed for the circuits in the FSZ skyscraper, FSZ low-floor building as well as HdR. The necessary measuring and control technology must also be renewed and connected to the central control room in the energy center. The conversion is only possible successively so that the site can be supplied with a sufficient amount of cold at all times. Therefore, first the new cold distribution and the cold storage

Being constructed. For this purpose, an adjacent technical room in the second basement of the FSZ Flachbau has to be constructed structurally as a new centralized distribution center. The technical operating rooms, which are located in the basement of the low-rise building, have partially contaminated cladding on steel girders and insulation on the technical equipment, which are to be removed.

Download full details as .pdf
The Buyer:
rbb Einkauf
CPV Code(s):
42500000 - Cooling and ventilation equipment
45000000 - Construction work