20E0512 (LBB NL Mainz) Mainz University of Applied Sciences Koblenzer Strasse - new building, 2nd construction phase / electrical work.
- approx. 1 central battery system with 5 substations,
- approx. 1 pc UPS system,
- approx. 7 pcs. NSHV distribution box,
- approx. 50 stand distributors,
- approx. 1,980 m hot-dip galvanized steel cable tray,
- approx. 1 540 m electrical installation duct, device installation,
- approx. 6 600 m electrical installation pipe,
- approx. 7 730 m bus cable KNX,
- approx. 92,000 m installation cable NYM-J,
- approx. 5 200 m cable NYY-J,
- approx. 7,000 m NYCWY cable,
- approx. 6 860 m cable NHXH-JFE,
- approx. 400 rocker switches,
- approx. 2,800 safety sockets,
- approx. 1,850 pieces of lights,
- approx. 1 130 fire protection seals,
- approx. 300 m
- approx. 1 520 m air-termination line Rd 8,
- approx. 56 projectors,
- approx. 2 building radio systems (BOS),
- approx. 1 fire alarm control panel,
- approx. 216 smoke detectors,
- approx. 1 260 m installation cable BMK JE-H (St) H,
- approx. 495 electronic double knob cylinders,
- approx. 1 entry station,
- approx. 1 hour exit station,
- approx. 3 710 m fiber optic indoor cable,
- approx. 137,000 m data cable Cat.7A,
- approx. 20 685 m installation cable JY / St) Y,
- approx. 910 m outdoor cable A-2Y (L) 2Y.