As part of the expansion of the Wolf service facility in Basel (CH), a 44-piece lifting jack system is being procured on track K14.
The delivery object roughly relates to the following points (not conclusively):
- Project support
- Engineering, manufacturing, delivery, assembly, commissioning and acceptance of the lifting jack system and the associated operating units
- installation of the controller
- Integration into the traction system locking chain
- Configuration of the wireless network over the entire length of the system to ensure communication of the plant's control
- voting meetings
- Creating and adapting plans (schedules, technical plans, etc.)
- One-time training of operating personnel
- Preparation and handing out of documentation
FOR FURTHER INFORMATION SEE CLAUSE 4.6
As part of the expansion of the Wolf service facility in Basel (CH), a 44-piece lifting jack system is being procured on track K14.
The delivery object roughly relates to the following points (not conclusively):
- Project support
- Engineering, manufacturing, delivery, assembly, commissioning and acceptance of the lifting jack system and the associated operating units
- installation of the controller
- Integration into the traction system locking chain
- Configuration of the wireless network over the entire length of the system to ensure communication of the plant's control
- voting meetings
- Creating and adapting plans (schedules, technical plans, etc.)
- One-time training of operating personnel
- Preparation and handing out of documentation
FOR FURTHER INFORMATION SEE CLAUSE 4.6