Carpentry interior work
For the measure "New construction of all-day primary school with sports hall in Seelze-Süd", carpentry work is needed for the interior of a school building, with locksmith work.
Brief description of the service:
- Approx. 60 linear metres of stair and parapet railings, including their load-bearing steel substructures and planking made of wood-based materials
- Approx. 90 m2 of wall coverings with acoustic absorber panels made of wood-based materials, including integrated (fire protection) interior doors and fixed glazing
- approx. 30 m2 of space-forming walls and parapets as a carpentry construction
- approx. 100 linear meters of solid wood handrails
- approx. 15 m2 motor-driven horizontal folding doors made of stainless steel, including their cladding acoustic absorber panels made of wood-based materials
Important note on the execution deadlines:
Start of execution: approx. 06 week 2024
End of execution: approx. 25 week 2024
For the construction process, see "Annex 15 Ausführungsfristen_(230904)".
Further information and details can be found in the specifications and other procurement documents.