Containerized Lithium-Ion Power Supply Systems for village electrification projects in Sierra Leone.
His tender focuses on power assets for 3 unelectrified communities in the southeast of Sierra Leone, which:
— are approx from with 400kWh to 550kWh battery capacity,
— and a PV capacity of 170kWp to 250kWp (on a separate contract),
— need to be grid-forming and have blackstart functionality (off-grid system),
— shall be supplied as easy-to-install / pre-assembled containerized solutions,
— include all needed equipment to connect the distribution grid (load).