Delivery and installation of a fire alarm system for BA 1 - BA 3
Fire alarm system BA 1 - BA 3:
Stage 1:
- Fire alarm panel for 2x18rings approx. 1 piece
- Fire brigade peripherals (FAT, FLK) approx. 1 piece
- Manual push button detector approx. 20 pieces
- Fire detector approx. 240 pieces
- Alarm transmitter approx. 20 pieces
- Coupler approx. 10 pieces
- RAS control panel 1-pipe with power supply approx. 1 piece
- RAS pipe approx. 20m
Construction phase 2:
- Fire brigade peripherals (FIBS, FSD) approx. 1 piece
- Manual push button detector approx. 35 pieces
- Fire detector approx. 260 pieces
- Alarm transmitter approx. 35 pieces
- Coupler approx. 5 pieces
- Shunting distributor E30 approx. 3 pieces
Construction phase 3:
- Manual push button detector approx. 45 pieces
- Fire detector approx. 415 pieces
- Alarm transmitter approx. 40 pieces
- Coupler approx. 20 pieces
- RAS control panel 2-pipe with power supply approx. 6 pieces
- RAS pipe approx. 850m
- Shunting distributor E30 approx. 1 piece