Operation of a water-purification plant | Tenderlake

Operation of a water-purification plant

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
03 July 2020
Closing Date:
31 August 2020
Location(s):
FRB05 Loir-et-Cher (FR FRANCE)
Description:
Operation of the inter-municipal wastewater treatment plant with a capacity of 37,500 PE and associated works

This consultation concerns the operation of the inter-municipal wastewater treatment plant with a capacity of 37,500 PE and associated works. The contract covers the operation of the Wastewater Treatment Unit (UTEU) of Vendôme, Saint-Ouen, Areines and Meslay and associated works including the pumping works of Saint-Ouen. The nominal capacity of the membrane technology processing unit is 37,500 population equivalents. the Saint-Ouen structures are broken down into a 1,000 m buffer basin 3 and a pneumatic station that can transfer up to 190 m 3 / h. the ancillary works include the discharge pipe from the treatment plant, the Saint-Ouen / Vendôme transfer pipe and its equipment, the arrival collectors, the bypass works. Execution places: UTEU: 77 avenue Ronsard - Vendôme, buffer basin: rue Rocheboyer - Saint-Ouen, 41100 Vendôme and Saint-Ouen.

Operation of the UTEU of Vendôme, Saint-Ouen, Areines and Meslay and ancillary works including the pumping works of Saint-Ouen. The nominal capacity of the membrane technology UTEU is 37,500 equivalent inhabitants. The Saint-Ouen structures are broken down into a 1,000 m buffer basin 3 and a pneumatic station that can transfer up to 190 m 3 / h. The ancillary works include the discharge pipe from the treatment plant, the Saint-Ouen / Vendôme transfer pipe and its equipment, arrival collectors, by-pass works.

Download full details as .pdf
The Buyer:
Territoires Vendômois
CPV Code(s):
45259100 - Wastewater-plant repair and maintenance work
65120000 - Operation of a water-purification plant