MWS Projektentwicklungsgesellschaft mbH Mannheim is planning to convert Spinelli Barracks BA 1, a former US base, in Mannheim, Freudenheim / Käfertal, on behalf of the city of Mannheim. The planning area covers approx. 10 ha.
The construction work includes the production of drainage systems and traffic routes in the intermediate expansion as well as the earthwork for supply lines and the laying of empty pipes.
Construction work:
- manufacture of road pavement;
- production of unbound base layers;
- Production of asphalt base course as a temporary construction road;
- Production of sewage sewerage DN / OD 355 PEHD;
- Manufacture of precast concrete manholes;
- Manufacture of drainage connection lines DN / OD 160 PEHD;
- Laying empty pipes and pipe bundles;
- Earthworks for supply lines.
Earthworks DIN 18300
Drainage works according to DIN 18306
Traffic route construction work DIN 18315, DIN 18317
Main amounts:
- Earth erosion approx. 8 500 m
- Road substructure approx. 31,000 m
- Frost protection layer approx. 14,500 m
- Asphalt base course approx. 9,500 m
- rainwater sewerage system DN 300 to DN 800, reinforced concrete approx. 520 m;
- dirty water sewerage DN / OD 315 to DN / OD 500, PP approx. 1 500 m;
- dirty water connection lines DN / OD 160 to DN / OD 200, PP approx. 200 m;
- prefabricated manholes DN1000 to DN1500, reinforced concrete approx. 45 units;
- Cable protection pipes DN / OD 50 to DN / OD 160 approx. 5 700 m.