Carrying out repair work on board the VS Capella as part of the shipyard period 2024 (class renewal).
The ship is classified according to the regulations of the Lloyds Register (LR for short). According to class specifications, a class renewal with an inspection of the underwater hull in dry dock must be carried out after 5 years. The ship must be drained for the necessary inspections and inspections and must be brought to a shipyard for this purpose from January 2024. Tests and acceptances must be carried out as part of the class renewal, including all necessary repair and maintenance work, in accordance with the regulations and under the supervision of the LR. All ballast water and fuel tanks are opened for the scheduled inspection, cleaned, assessed and repaired if necessary. If necessary, the tanks should be completely sandblasted and re-preserved due to corrosion. More details of the scope of the order can be found in the attached bill of quantities.