Expansion of Diskaustraße in 04249 Leipzig; 1. BA between Brückenstraße and Huttenstraße
Supply and plant 3 avenue trees including completion or development maintenance
3,640 m² milling and recycling or disposal of asphalt 2760 m² producing asphalt binder course 8 cm thick
Making 100 m² asphalt base course 10 cm thick
2,140 m² asphalt base course 26 cm thick
5 pcs of lighting poles including electrical installation work
Demolish 20 m³ of concrete and masonry
30 m² concrete paving surface
30 m² concrete paving surface Mat. of the AG
75 m² laying guide plates for the blind
Dissolve and recycle 330 m³ of soil
224 m of natural stone kerbstones
166 m curb made of natural stone
214 m curb made of natural stone of the AG set
Set 18 m bus curb
Install 20 pcs bicycle leaning bar
Produce 310 m³ frost protection/gravel base layer
Supply and plant 2 trees and shrubs including completion or development maintenance
Install 2 pcs stool bench
1,620 m² Hydraulically bonded base course 25 cm thick 3,700 m² Explosive ordnance investigation by means of surface sounding
200 m² of small pavement
100 m² copper slag paving ceiling, Mat. of the AG
200 m of trench
255 m³ of trenches
Marking and signage work
Pick up and restore 40 m² mosaic paving ceiling
260 m² mosaic paving ceiling
Supply and cover 110 m² topsoil
Laying 80 m PP pipe DN 150
Produce 160 m² lawn seeding
Absorb and recycle 950 m³ layers without binders
2,640 m² of grit mastic asphalt 4 cm thick
Make 12 m steel mesh fence
7 St road drains
13 pcs of road drains including connecting cables
15 m Hedge clearing 20 m² shrubs clearing
3 pcs Produce signage including execution documents and statics
15 m fences
3,370 m² of grade
Civil engineering services for LSA
3 years of completion and development maintenance
civil engineering work for utilities,
Traffic management during the construction period in various traffic management phases including temporary LSA
Replacement construction of enclosure wall incl. statics, execution drawings, demolition and earthworks