Heating, ventilation and air-conditioning installation work | Tenderlake

Heating, ventilation and air-conditioning installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
18 August 2023
Closing Date:
14 September 2023
Location(s):
DEB38 Speyer, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Heating work - Central Emergency Department Building C1

Installation of heating pipes, radiators and connection of ventilation units

Heater:

The pipe material heater is made of black steel pipe.

On the ground floor the radiators are to be connected, in the basement the ventilation units are to be connected.

The heating pipes are 100% insulated with mineral fibre shells.

The heating work is to be carried out on the ground floor and in the basement.

Fire protection is carried out between the floors on concrete ceilings and on the fire-resistant walls, which are partly made of masonry and partly drywall.

Cold:

The cold pipe material is made of black steel pipe.

On the ground floor, circulating air coolers are to be connected in the electrical rooms, and the ventilation units are to be connected in the basement.

The refrigeration pipes 6/12°C are insulated against condensation with vinyl rubber hoses.

The heating work is to be carried out on the ground floor and in the basement.

Fire protection is carried out between the floors on concrete ceilings and on the fire-resistant walls, which are partly made of masonry and partly drywall.

Download full details as .pdf
The Buyer:
Krankenhausstiftung der Niederbronner Schwestern, Sankt Vincentius Krankenhaus
CPV Code(s):
45331000 - Heating, ventilation and air-conditioning installation work