The Neue Bahnstadt Opladen GmbH plans on behalf of the city of Leverkusen the construction of a ramp construction in open space under construction, which forms the connection to the existing campus bridge.
Civil engineering and structural workDeep and shell construction works are tendered. The main masses contained are:
- Concrete works 430 m
- Formwork 1200 m
- Creation of reinforced ceiling panels 475 m
Stahlbauarbeiten:
Metalworking: 465 m
Ramp construction: welded steel mesh and steel bars approx. 35 700 kg
Section steel, hot-dip galvanized and powder-coated, approx. 77 030 kg Steel staircase 1 pc.
Asphalt and mastic asphalt surfaces 650 m
Epoxy-bonded asphalt coating 650 m
Railing approx. 430 m
Tendril for greening: approx. 100 steel cables
Power InstallationsPower / lighting:
Delivery and installation of:
100 surface-mounted luminaires of different sizes
230 m cable channel V2A
1 200 m cable
90 pieces branch channel
Coordination of cable management