Lot 2 Open spaces 1 terrain clearance
Terrain clearance / clearing work
specifications
- Tear down 80 m of steel fence, incl. gate
- 55 m Tear down wooden fences
- Clear 900 m² plant cover
- Break off 12 m³ masonry
- Demolition of 15 m³ foundations
- Rework 11 m² foundation tops
- Demolition and disposal of 925 m² of concrete slabs
- Accommodate 60 m² of concrete slabs
- Pick up and dispose of 170 m² of pavement
- Break off 220 linear meters of concrete pavement 1-/2-line
- 20 m one-liner granite break off
- 75 m³ play/fall protection sand picking/disposing of
- Loosen and dispose of 180 m³ of topsoil
- 350 m³ Unbound base courses on debris
- Remove 29 running meters of wood/concrete benches
- 110 running metres of surround roundel/playing areas
- Dispose of 8 wastepaper baskets
- Pick up and dispose of 35 boulders
- Cancel 3 pcs large equipment
- 215 m² Clearing shrubs
- 16 pieces of tree felling
- 18 pcs Remove root stumps
- 390 m tree protection fence with 600 days retention period
- 210 m² fall protection areas for playground equipment to be moved with substructure
- 1 pc make septic tank
- Move 4 pieces of playground equipment
- 150 m² Rasenherstellung