Projektkurzbeschreibung:
The project is an existing school building, which will be completely gutted and supplemented by a new extension. The existing building has a partial basement and consists of 4 floors (basement to 2nd floor) with a flat roof. The new building does not have a basement and begins with the floor slab on the ground floor. It consists of EG-2. Og and also receives a flat roof.
On the existing building, the remaining base layer elements are to be subjected to a concrete renovation with an increase in concrete coverage by shotcrete application on an existing former sandwich area made of reinforced concrete (approx. 900m²).
Inside the building, existing damage to the reinforced concrete structure must be repaired by local concrete repairs.
Concrete repair